Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

ProWrite’s Improved Bulk Continuity

ProWrite’s New Improved Bulk Continuity is a Full Robust Feature. The Improved Bulk Continuity allows the input of continuity entries for multiple welders at once. It can also store multiple pending continuity entries in a non-committed state that will not count in calculating a welder's expiration.

 

To create a new Bulk Continuity entry, select Welders → New Bulk Continuity.

Image Removed

To access an existing Bulk Continuity entry, select Welders → Edit Bulk Continuity.

Image RemovedQuality Control Professional, CWI’s, Welding Engineers, Foremans and Welding Managers the ease of updating welder’s continuity in Bulk, updating multiple welders in an instant.

Reports may be exported to Excel, CSV, and Pdf format allowing documentation to be shared. Reports of welders with upcoming expirations may be exported to Excel, emailed to production floor, or test shops to await an updated excel sheet with dates, dates can then be placed into PW updating all your welder’s continuity in just a few clicks.

With more Robust Filtering and Sorting Features, user’s may now filter and sort on various attributes of the Welder as well as attributes of the  Welder’s Process. Users may filter and sort on Welder ID, Stamp Number, Welder’s First Name, Last Name, Location, Foreman,  as well as Process and Method. 

Image Added


Single Welders and Multiple Welders may be updated using this new feature. Allowing an update to each welder’s Weld Date, Who certified the continuity entry, the Job, Inspection Type, Length Inspected and Length of Defect, All at once.  With these features ProWrite will save you time and money.

Image Added


Workflow

Filter for the Welders you'd like to add continuity to, any criteria visible can be easily filtered using the same process as on any CEI grid.

Image Added


Once Filtered for the desired Welders select "Add Continuity"-

Image Added

You will now see a list of all the Welder/Processes you need to work with-

Image Added

Select which Welders/Processes you wan to assign new continuity entries to-

Image Added

Populate the Date, Inspection Type and other data-

Image Added

Select "Assign" to add this to the given Welders/Processes-

Image Added

Select "Save" to commit/write these continuity entries to the Welder's Permanent History Record-

Image Added

Note that you can add multiple different continuity collections (1 per welder, see "serial number") all from this screen.


For Filtering Help See Below:

Basic Filtering:

https://thinkcei.atlassian.net/wiki/spaces/CEIKB/pages/24936712/Filtering+-+Basic

Advanced Filtering:

https://thinkcei.atlassian.net/wiki/spaces/CEIKB/pages/24936733/Filtering+-+Advanced