Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Important: On-premise users not yet transitioned to a MS SQL Database please contact CEI Support before installing.

New Features

• Integrated Weld Cad into ProWrite Welding Software. (S9, D1)

User Interface
• Replaced “Bulk Continuity” with “Improved Bulk Continuity”. (S9, D1)
“Bulk Continuity” temporarily available upon request

Code Changes and Updates
• Base metals have been added and updated to existing Base Metals in the Base Metal Database. (S9)
• Filler metals have been added and updated to existing Filler Metals in the Filler Metal Database. (S9, D1)
• Essential Variable Change to WPS minimum base metal thickness calculation when Impact Testing (S9)
• Essential Variable Change to Post Braze Heat Treatment for PBHT Type, Holding time, & Temperature (S9)
• Essential Variable Change to WPS maximum base metal thickness calculation when using PWHT (S9)


Report Updates
• Added Continuity Report with Signature and Logo to custom reports. (S9, D1)

Performance Improvements
• Updated associated companies field to increase speed of the program. (S9, D1)

Issues Resolved
• Resolved issue of Continuity report not filtering out data correctly. (S9, D1)
• Resolved issue of WPSs created from multiple PQRs showing incorrectly filler metal (S9)
• Resolved issue of not being able to create a WPQ using a WPS. (D1)
• Resolved issue of previous code year PQRs with multiple processes not matching processes correctly. (S9) 
• Resolved issue of not being able to change welder’s id. (S9, D1)
• Resolved issue of not being able to assign welders to a Foreman, Location or Local Number. (S9, D1)
• Resolved issue of Stud Weld WPS not showing Stud size, Arc Time, Amperage or Voltage in UI. (S9)

Misc. Information
• Updated documents to represent latest Code release year. (S9)